Surface preparation: Before applying, remove weak areas from the base, widen cracks.
Clean the surface from dirt, dust, grease, and paint residue.
Depending on the surface, it is recommended to treat it with concrete contact.
Work can begin after 4-5 hours. Mix preparation:
Pour 4.75-5.25 liters of water into a clean container per 25 kg of dry mix.
Gradually add the dry mix and stir with a mixer until a homogeneous solution is obtained.
Application: Apply the homogeneous solution to the surface with a stainless steel trowel.
The thickness of the applied layer should be at least 1 cm. Work should be done at temperatures not lower than +10°C. Storage:
Store in a dry place at temperatures not exceeding +45°C and humidity not exceeding 75%.
Shelf life — 6 months.